San Juan Pump Station and the Asylum and No Name Creek Channel Rectification Project

San Juan Pump Station and the Asylum and No Name Creek Channel Rectification Project

The San Antonio River was the focal point and life line of the early Spanish missionaries and colonists. The missions were in fact located in close proximity to the San Antonio River because it was the last source of water before moving into the great Chihuahua desert to the south. Mission San Juan Capistrano was one of the five colonial missions established along the San Antonio River. The Spaniards and the Native Americans built a dam and acequia to divert fresh water to the mission and to irrigate mission fields. Water flowed in the acequia for over two hundred years and was still used to irrigate pecan orchards long after the secularization of the mission when a realignment and channelization project for flood control stopped the flow of water. The San Juan Acequia was also eroded by increased flood water flowing down the Asylum and No Name Creeks, causing a breach in the acequia as it crossed the creeks. The purpose of this project was to restore the flow of water down the acequia and to repair the acequia where it crossed the creeks. Restoration of the flow of water in the acequia satisfies the oldest water right in the State of Texas with a priority date of December 31, 1731.

The San Juan Pump Station can supply 21 cfs of flow to the San Juan Acequia and 5 cfs to the Symphony Lane Neighborhood. Symphony Lane is located along an old bend of the river and also was isolated as a result of the channelization project. The pump station consists of two 48-inch 6.5 cfs screw pumps and one 60-inch 13 cfs screw pump. The screw pumps lift water to the San Juan Acequia and the west side of the river for the Symphony Lane Neighborhood. The pump station can be programmed to deliver variable amounts of water at various pumping schedules. Automatic shut down of the pumps occurs when the water elevation drops to five feet above the diversion dam (elevation 545) during flood conditions.

The Asylum and No Name Creeks portion of the project provides improved flood control, erosion control and newly constructed earthen berms to improve the flow of flood water as it flows of the acequia.

The $6.7 million project was built by Bryan Construction Company, Inc. of Bryan, Texas and was completed in the summer of 1994.

Project Details:

Share:

Facebook
Twitter
LinkedIn
Email

Related Projects

This project will assess the long-term space needs of the River Authority and evaluate various options regarding new building designs for the property located at…
This project will begin design and construction on Mann’s Crossing Park on the Medina River, Hendrick Arnold Park (Straus medina), Trueheart Ranch, and Espada Park.…
The River Authority serves as project manager and administrator for the City of San Antonio Proposition 1-funded water quality projects of the Edwards Aquifer Protection…

Alerts

San Pedro Creek Culture Park – Facility Maintenance Alert

Please be advised that the women’s restroom at the AME site is currently closed for maintenance and will remain unavailable through the end of tomorrow.

We apologize for any inconvenience and appreciate your patience and understanding.

Trail Closure: Museum Reach at Pearl

* Trail temporarily closed from 2/3/2025 until 4/25/2025.
* For southbound pedestrian traffic, please exit the river and utilize the Hotel Emma bridge to gain access to the east side river trail. Access to the east side river trail via the elevator or stairs.
* For northbound pedestrian traffic, please exit the river trail at the south bridge to gain access to the east side river trail. Continue north through Pearl towards Hotel Emma. The west & east side river trail accessible via the Hotel Emma bridge.

North Bridge West Landing & Stairs Trail Closure Map

 

Goliad Paddling Trail Alert

NOTICE: HWY 59 Landing Site Closed

Due to TxDOT construction on the HWY 59 Bridge, the HWY 59 landing site is closed until further notice. However, the Goliad Paddling Trail remains open, and paddlers can still access the river at the Riverdale, Ferry Street, and Goliad State Park landings.

Please plan accordingly and check back for updates.

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.