Constructed as part of the federal San Antonio Channel Improvements Project (SACIP), the Espada Dam was designed and built to maintain a base flow to the Spanish Colonial Dam on the west bank while also permitting flood flows to overtop the dam and flow directing down the improved flood channel. The impoundment behind the dam was named Davis Lake.
Trail Closure: Museum Reach Trail
Please be advised that the Museum Reach Trail at the Pearl South Bridge will be closed from Thursday, December 19, 2024, through Friday, December 20, 2024, until close of business.
This closure affects the west bank of the river between Newell Street and Myrtle Street due to construction on the trail. Barricades and signage are in place to indicate the closure and provide alternative routes.
We apologize for the inconvenience and appreciate your understanding and cooperation during this period.
Note: Please exercise caution and follow all posted signage and barricades in the area.