Westside Creeks Ecosystem Restoration Project moves into design phase

Written by:

Posted on:

Categories:

Share:

Facebook
Twitter
LinkedIn
Email

Get The Latest:

Join our print or digital newsletter to be informed about the agency’s many projects and other news.

View of Westside Creeks Restoration Project

Last Updated on January 30, 2024

The San Antonio River Authority (River Authority), in partnership with the U.S. Army Corps of Engineers Fort Worth District officials, recently signed a project partnership agreement establishing the path forward for the Westside Creeks Ecosystem Restoration Project. The signing of the project partnership agreement allows for the design of the project to get underway. The project will restore as best as possible the aquatic ecosystems of Apache, Alazán, Martinez, and San Pedro creeks with native grasses, wildflowers, and trees—like the Mission Reach Ecosystem Restoration project, but on a creek scale.

Map of the Westside Creeks

Now that the project partnership agreement is executed, the River Authority is hosting a Westside Creeks Open House on Tuesday, November 15, 2022. We invite all interested residents to this event where they can learn more about the project and provide initial thoughts on recreational components of the project.

Westside Creeks Open House

District 2 River Authority Director Lourdes Galvan welcomes this new phase of the project:

“The River Authority and community have been working on this project for a long time and it is nice to see it move into the design phase where people can begin to see and truly understand what the project will look like upon completion. This summer the Assistant Secretary of the Army for Civil Works projects, the highest-ranking civilian in the U.S. Army Corps of Engineers, visited the creeks to learn more about the project. The Westside Creeks and this project are garnering a lot of attention.”

Lourdes Galvan

District 2 River Authority Director Lourdes Galvan

US Army Corps of Engineers, the Bexar County Commissioners Court, and the River Authority's Board visit Westside Creeks

The Assistant Secretary of the Army for Civil Works, Mr. Michael L. Connor, Precinct 1 Bexar County Commissioner Rebeca Clay-Flores, and River Authority Board Members Chairman Jim Campbell and District 2 Member Lourdes Galvan visited the Mission Reach and Westside Creeks Ecosystem Restoration projects in March 2022.

Changes to the Westside Creeks and their surrounding environment over the last half-century are largely due to the growing City of San Antonio, the flood mitigation provided by the channelization of the creeks through the San Antonio Channel Improvement Project, and the subsequent required operation and maintenance practices such as routine mowing. The result is a creek system where the once densely vegetated creeks were deepened and widened, and thick vegetation removed. Presently, the creeks appear more like flood channels than desired natural resources.

Alazan Creek Before and After

Left: Alazán Creek after channelization projects. Right: Alazán Creek as it appears today, with mowed banks.

The Westside Creeks Ecosystem Restoration Project will help restore the riverine ecosystem and add recreation opportunities compatible with the U.S. Army Corps of Engineers’ ecosystem restoration objectives.

Precinct 2 Bexar County Commissioner Justin Rodriguez said, “prior to the channelization of the creeks, many families would fish and picnic near their banks. The channelization brought improved flood mitigation, however, as we’ve seen with the Mission Reach, with contemporary engineering practices we can have flood control and more natural creeks that improve our quality of life as well as that for migratory birds, fish, and other animals.”

Bexar County Commissioner Justin Rodriguez

Precinct 2 Bexar County Commissioner Justin Rodriguez 

Ecosystem restoration measures will consist of removing nonnative vegetation while planting native grasses, wildflowers, and trees that will stabilize the creekbanks, provide food sources to native fish and migratory birds and restore the creek channels, as best as possible, to more natural riffle, pool, run sequences. Recreational features within the project area will include interpretive signs, park benches, picnic tables, water fountains, and multi-use trails. The San Antonio community will likely be familiar with these measures as they are consistent with the restoration measures implemented on the Mission Reach Ecosystem Restoration and Recreation Project.

The Mission Reach of the San Antonio River Walk

The Mission Reach of the San Antonio River Walk

For more information on the Westside Creeks Ecosystem Restoration project, please visit the newly updated project website at www.westsidecreeks.com. All project information, future public meetings, and past meeting materials will be posted on the website.


The River Reach is back!

River Reach is a quarterly, 12-page newsletter that is designed to inform the San Antonio River Authority’s constituents about the agency’s many projects, serve as a communication vehicle for the board of directors and foster a sense of unity and identity among the residents of Bexar, Wilson, Karnes, and Goliad counties.

If you wish to be placed on the mailing list for River Reach, please contact us or complete the form.

Related Articles

Alerts

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

Stem Density Efforts

Please be advised that trails near the Confluence Park and Conception Park area will be temporarily closed due to ongoing Stem Density efforts. We appreciate your cooperation and ask that you remain mindful of workers and closures when in the vicinity. Thank you for your patience as we work to improve our natural spaces!

 

West Bank Trail Closure Notice

Due to the construction of a new trail and bridge, the West Bank of the trail between Schiller St. and Newell St. will be closed for the next couple of months. The East Bank will also be intermittently closed on Monday, November 4th, to install the bridge. Please use caution when navigating around this area. We apologize for any inconvenience.

Please refer to the map for reference. 

San Pedro Creek Culture Park

The restrooms at South Alamo will be temporarily closed for maintenance and repairs. We apologize for any inconvenience and appreciate your understanding. 

Acequia Trail Notice

The Acequia trail will have heavy traffic near MROC starting May 22nd until further notice. The SAWS Acequia project will be bringing in crews to work on the lift station site and across the street. There will have flaggers to stop traffic, please use caution. 

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.