River Authority Sells Wastewater Treatment Facility as City of Elmendorf Gears Up for Growth

Written by:

Posted on:

Categories:

Share:

Facebook
Twitter
LinkedIn
Email

Get The Latest:

Join our print or digital newsletter to be informed about the agency’s many projects and other news.

SAN ANTONIO – On December 19, 2019, the San Antonio River Authority (River Authority) closed the sale of the wastewater treatment plant off Highway 181 South. The City of Elmendorf purchased the facility to enter the wastewater business and in preparation for the growth they expect to draw from a new, 1,000-acre planned subdivision that is in development.

“This development is positioning our city to grow exponentially in the years to come. Securing this wastewater treatment facility and building our operational capabilities is part of how we’re preparing for the influx in our population,” said Cody Dailey, City Administrator.

The wastewater treatment plant opened in 2007 and was originally constructed to serve the Homewood subdivision north of the City. It currently serves approximately 102 residents and is permitted for 90,000 gallons per day. Throughout the process of the sale, the River Authority worked closely with the City of Elmendorf to share operational best practices and support their capacity building efforts.   

The City of Elmendorf intends to use the plant to provide interim service to the new subdivision during the construction phase and to help them prepare to take on the operational utility needs that the growing city will have. They look forward to beginning the development of a new wastewater treatment facility in the future.

“The River Authority is committed to preserving and protecting the San Antonio River and one of the ways we have done that is to play a role in ensuring that wastewater is handled responsibly as the areas we serve around our region continue to experience dramatic growth,” said River Authority’s Utilities Manager Amy Middleton. “We are pleased to see the City of Elmendorf taking proactive measures to do the same in the midst of this impending boom in their population.”

The River Authority began providing wastewater utility services in 1966. Today, the River Authority has five permitted active wastewater treatment plants. These plants utilize the latest technology to produce a high-quality effluent and to preserve the ecosystems into which the effluent is returned, including at the recently opened Martinez IV Wastewater Treatment Plant in Eastern Bexar County, which has been recognized by the Institute for Sustainable Infrastructure and the American Council of Engineering Companies – Texas for its sustainable design and engineering.

Related Articles

Alerts

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

Stem Density Efforts

Please be advised that trails near the Confluence Park and Conception Park area will be temporarily closed due to ongoing Stem Density efforts. We appreciate your cooperation and ask that you remain mindful of workers and closures when in the vicinity. Thank you for your patience as we work to improve our natural spaces!

 

Gas Spill

The San Antonio River Authority and the City of San Antonio are actively working to contain a recent gas spill in the Downtown River Walk Loop area, which occurred earlier today. The source of the spill is unknown but has stopped. At this time, no environmental impacts have been observed, and teams are implementing measures to fully contain and remove the substance. We will provide updates as the situation develops.

West Bank Trail Closure Notice

Due to the construction of a new trail and bridge, the West Bank of the trail between Schiller St. and Newell St. will be closed for the next couple of months. The East Bank will also be intermittently closed on Monday, November 4th, to install the bridge. Please use caution when navigating around this area. We apologize for any inconvenience.

Please refer to the map for reference. 

San Pedro Creek Culture Park

The restrooms at South Alamo will be temporarily closed for maintenance and repairs. We apologize for any inconvenience and appreciate your understanding. 

Acequia Trail Notice

The Acequia trail will have heavy traffic near MROC starting May 22nd until further notice. The SAWS Acequia project will be bringing in crews to work on the lift station site and across the street. There will have flaggers to stop traffic, please use caution. 

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.