Green Infrastructure (GI)

The San Antonio River Basin Interactive Green Infrastructure Map provides a place to share Green Infrastructure projects funded by the San Antonio River Authority, access resources, and learn how you can participate. Together, we are all making a difference.

Since 2014, the San Antonio River Authority (River Authority) has provided incentives such as rebates for the creation of green infrastructure features. The River Authority has also created an interactive green infrastructure dashboard (below) that provides information about the amount of stormwater and select pollutants that the features manage.

Green Infrastructure 101

Stormwater runoff is the greatest threat to river health in the San Antonio River watershed with many other US communities reporting the same problem. Unlike pollution from an industrial pipe, which can be traced to its source, stormwater runoff can originate from anywhere within our watershed such as parking lots, rooftops, unsecured construction sites, roadways, and even our own yards. In urban areas, runoff is designed to be carried from these surfaces to the storm drain system and then directly to a nearby river, creek, or stream.

In our watershed, stormwater runoff is not cleaned at a treatment plant before being discharged into the environment. Pollutants like oil, grease, metals, bacteria, sediment, fertilizers, pesticides, pet waste, and thermal pollution accumulate on the surfaces. During rains, runoff carries the pollutants to our creeks and rivers and during hard downpours, runoff can contribute to street and neighborhood flooding. Stormwater runoff prevents creeks and rivers from primary and secondary contact recreation during and for approximately 72 hours after rain events. Over time, surges of runoff from urbanized areas erode creek banks and can negatively affect bridge and other community infrastructure.

Green infrastructure is a design and land development approach that alleviates these negative runoff impacts. Bioretention systems, stormwater cisterns, permeable pavement, buffers, retention of native infiltrative soils, green space preservation, natural channel (river) design, and several other sustainable development approaches perform natural or nature-mimicking functions that slow, capture, and/or clean stormwater runoff—like nature intended. The design and installation of green infrastructure meets our goals of reducing local flooding and improving water quality by mimicking natural areas to slow, detain, and filter stormwater.

Unlike a storm drain and concrete-lined river segment, which are designed for the singular purpose of water passage, green infrastructure provides multiple benefits.

Along with reducing neighborhood flooding and pollution in our creeks and rivers, green infrastructure benefits include:

  • reducing the heat island effect
  • improving human health
  • creating or preserving valuable wildlife habitat, including for monarchs, bees, and other pollinators essential to our human food supply

Green Stormwater Infrastructure Legend

  • Treated Stormwater Volume is the volume of stormwater treated by Green Infrastructure methods to improve water quality, using one or more processes: infiltration, filtration, pollutant settling, or bioremediation. Treated Stormwater Volume is measured in cubic feet (1cubic foot = 7.5 gallons).
  • Bioretention, called rain gardens, are shallow landscaped areas designed to slow and clean stormwater runoff, reduce local flooding, and protect stream health.
  • Bioswales are shallow vegetated drainage paths that soak up and filter stormwater runoff from roofs or pavement. Bioswales are constructed with quick-draining soil and drainage layers to filter stormwater and provide water for plants.
  • Cisterns are containers that store primarily roof runoff, keeping stormwater on-site during storms to mitigate flooding and often used later for supplementary watering.
  • Permeable Pavement is a load-bearing paving method that allows for infiltration, on-site storage, and settling of stormwater pollutants to clean and reduce runoff during a storm.
  • Sediment are fine particles suspended in stormwater. Sediment from stormwater makes streams and rivers appear cloudy which affects the health of all river plants and animals. Other pollutants such as nutrients, metals and bacteria attach to sediment and are deposited at the stream bottom where they can harm plants and animals.
  • Bacteria measures fecal coliform bacteria which is measured in number of colonies. Fecal coliform is used as an indicator of contamination with other pathogens which cause disease in humans. When bacterial levels are high, human contact can result in sickness. Reducing bacteria makes the river safe for contact activities.
  • Green Roof are rooftop planted areas that reduce or eliminate runoff leaving the roof through stormwater capture, plant uptake, and evapotranspiration.

Green Infrastructure Master Plan

Through Clean Water Act Section 319(h) Grant Funding from the Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ) and the San Antonio River Authority (River Authority) have entered into the Upper San Antonio River Watershed Protection Plan (WPP) Implementation – Green Stormwater Infrastructure Master Plan contract.

The San Antonio River Authority (River Authority) was awarded a Clean Water Act Section 319(h) Grant by the U.S. Environmental Protection Agency, administered by the Texas Commission on Environmental Quality (TCEQ) to develop a master plan for the use of green stormwater infrastructure (GSI). This grant project builds off recommendations made in the Upper San Antonio River Watershed Protection Plan (WPP) to implement GSI to reduce stormwater runoff pollution and addresses measures in the Texas Non-Point Source Management Program.

Acknowledgement of Financial Support

Traditional stormwater infrastructure is designed to manage stormwater volume, not stormwater quality. GSI are constructed features that add the stormwater quality component by mimicking the predevelopment hydrology of an area. Examples are bioretention basins (called rain gardens) and swales, extended detention basins, constructed wetlands, vegetated filter strips, cisterns, and permeable pavement and pavers. They are designed to clean and reduce local flooding by capturing and treating stormwater runoff pollution before it enters local creeks and rivers.

Since GSI is still relatively new to the San Antonio River Basin (SARB), the Master Plan aims to guide decision-makers on where and how to apply limited resources in the upcoming years to maximize water quality benefits while addressing local flooding concerns. The River Authority incorporated stakeholder input to identify and build on common goals and investment priorities for implementing GSI.

The River Authority’s watershed scale models have identified sub-basins or small watersheds that have the highest stormwater pollutant load reduction potential. This project used existing data and modeling tools to identify and prioritize sites within those areas that have the highest potential for GSI implementation effectiveness. Properties considered for implementation included public lands, schools, capital improvement projects, city planning areas, and neighborhoods with supportive stakeholders such as homeowner’s association partners.

For the recommended sites, the River Authority developed site-scale models, concept-level designs, and GSI cost estimates. Using an existing model, the River Authority estimated the pollutant load reductions these projects would achieve across the watershed. The GSI Master Plan will include a recommended schedule of implementation, the stakeholder process, costs, funding considerations, and the overall evaluation and prioritization process – all as examples communities can use for their own decision-making. The GSI Master Plan will also include an evaluation of Triple Bottom Line (TBL) benefits (social, environmental, economic). Ultimately, the goal is for the GSI Master Plan to become a template for all sub-basins not meeting water quality standards in the SARB.

Guenther and Euclid Retrofit

Through Clean Water Act Section 319(h) Grant Funding from the Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ) and the San Antonio River Authority (River Authority) have entered into the Upper San Antonio River Watershed Protection Plan (WPP) Implementation – Green Stormwater Infrastructure Master Plan contract.

The Guenther and Euclid Stormwater Retrofit Project allows the River Authority to implement demonstration stormwater retrofits. The low impact development (LID) best management practices (BMPs) utilized for this project are identified in the Upper San Antonio River WPP.

Guenther's Upper Mill

The San Antonio River Basin’s primary source of pollution is non-point stormwater runoff. Low Impact Development  is a sustainable land planning and design approach that manages stormwater on site using permanent stormwater BMPs.  LID treats small, frequent storm events on-site with a focus on “first flush” pollutants. These are pollutants such as oils, pesticides, E. coli bacteria, and other constituents that, under a traditional site-to-street-to-stormdrain-to-creek stormwater conveyance system, wash off hardened surfaces and into our streams. LID also reduces the volume of runoff generated on a site, thereby reducing pollutant loading to the waterbody.

Demonstration BMPs were constructed in accordance with the River Authority’s LID Technical Guidance Manual, and provide case studies of highly urbanized construction retrofits. At the River Authority’s headquarters on 100 E. Guenther St., permeable pavers, bioretention areas, and cisterns address pollutant export that flows directly into the San Antonio River. At the River Authority’s Environmental Center, 600 E. Euclid Ave. two 22-foot tall cisterns were added to collect two-thirds of the building’s rooftop runoff and are used in an onsite irrigation system.

The demonstration BMPs installed through this project have become a public education tool on how retrofits and LID can reduce storm water runoff and non-point source pollution.

Learn more about LID feature construction in these videos:

Public Outreach Timeline

May 2017
Guenther Euclid Stormwater Retrofit Interactive Story Map
March 2017
King William Association features The River Authority's Open House
Open House Flyer
November 2016
Guenther St. Permeable Paver and Rain Garden Complete Construction
October 2016
The San Antonio River Authority Awarded Grant for Stormwater Retrofits | San Antonio Business Journal
July 2016
Pardon Our Dust: Onsite Stormwater Management Summer Construction Announcement
Stormwater retrofit announcement
February 2016
“Committed to Water Quality - SARA Awarded Grant for Guenther Building Retrofits” featured in King William Association Newsletter

Alerts

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

Stem Density Efforts

Please be advised that trails near the Confluence Park and Conception Park area will be temporarily closed due to ongoing Stem Density efforts. We appreciate your cooperation and ask that you remain mindful of workers and closures when in the vicinity. Thank you for your patience as we work to improve our natural spaces!  

Gas Spill

The San Antonio River Authority and the City of San Antonio are actively working to contain a recent gas spill in the Downtown River Walk Loop area, which occurred earlier today. The source of the spill is unknown but has stopped. At this time, no environmental impacts have been observed, and teams are implementing measures to fully contain and remove the substance. We will provide updates as the situation develops.

West Bank Trail Closure Notice

Due to the construction of a new trail and bridge, the West Bank of the trail between Schiller St. and Newell St. will be closed for the next couple of months. The East Bank will also be intermittently closed on Monday, November 4th, to install the bridge. Please use caution when navigating around this area. We apologize for any inconvenience. Please refer to the map for reference. 

San Pedro Creek Culture Park

The restrooms at South Alamo will be temporarily closed for maintenance and repairs. We apologize for any inconvenience and appreciate your understanding. 

Acequia Trail Notice

The Acequia trail will have heavy traffic near MROC starting May 22nd until further notice. The SAWS Acequia project will be bringing in crews to work on the lift station site and across the street. There will have flaggers to stop traffic, please use caution. 

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park. *Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.